Camanche Pumping Plant Rendering

Above image is a three-dimensional rendering of the pumping plant. |
General Information
Contractor Work Hours
7 am – 6 pm, Monday – Friday
Construction Timeframe
Fall 2007 – Spring 2009
Contact
Gerald Schwartz
EBMUD Community Ombudsman
(209) 334-3048
gschwart@ebmud.com
You can view slideshows of the Camanche Pumping Plant construction here |
About the Camanche Pumping Plant
The Camanche Station Pumping Plant is a new 100 million gallon per day (MGD) pumping plant. Construction of the pumping plant includes the following
- A reinforced concrete pumping plant building approximately 46 ft wide x 217 ft long with related piping. Furnish and install four variable frequency drive, 2000 hp vertical turbine pumps and motors.
- Site piping and valves including a 84" diameter ML&CS suction header and 72" ML&CS discharge header.
- A 50,000 gallon, 144 foot diameter underground steel surge tank.
- A 4 million gallon prestressed concrete reservoir with aluminum dome roof and foundation, including associated piping and instruments.
- A 230 kV transmission substation with a reinforced concrete substation control building approximately 46 ft wide x 55 ft long, three SF6 circuit breakers in a ring bus arrangement, isolating switches, metering unit, instrument transformers, structures, capacitor bank, and load-tap changing power transformer.
- A 12.47 kV indoor main and transfer bus metal-clad switchgear lineup.
- A 12.47/7.2 kV three-phase, four-wire overhead distribution line with two OPGW cables from Camanche PP substation to the Mokelumne Fish Hatchery.
- An asphalt driveway and parking areas for the pumping plant and landscaping around the pumping plant.
- Moving debris and stored equipment from the Camanche site to an adjacent District property.
|
Current Activities
No upcoming construction activities |