Intake Facility & Pipeline Segments
Pipeline Segments
Pipeline Segment 1
Contractor: Steve P. Rados Inc.
Segment 1 runs between Interstate 5 and Highway 99 in Sacramento. Starting at the water intake facility, the alignment crosses under I-5 and proceeds east along the planned extension of Cosumnes River Boulevard to Franklin Boulevard. It continues along Cosumnes River Boulevard to Bruceville Road, turns north on Bruceville, then east on Timberlake Way, crossing under Highway 99 and emerging at East Stockton Boulevard.
Length: Approximately 5 miles.
Pipeline Segment 2
Contractor: Steve P. Rados Inc.
Segment 2 extends 7.6 miles from Highway 99 to the Gerber/Vineyard Road intersection. It begins at East Stockton Boulevard and Auberry Drive, continues east on Auberry to Power Inn Road, north on Power Inn to Elsie Avenue, then east on Elsie to Wilbur Way. From there it runs north on Wilbur and east on Gerber Road to Vineyard Road.
Pipeline Segment 3
Contractor: S.J. Louis Companies
Segment 3 begins at Gerber and Vineyard Roads and proceeds east along Gerber Road through approximately four miles of open land to the Folsom South Canal near Grant Line Road. This 72-inch diameter pipeline can deliver up to 100 million gallons per day (MGD) to EBMUD during dry years. Water is discharged into the Folsom South Canal and pumped to EBMUD’s Mokelumne Aqueducts in San Joaquin County for a 90-mile journey to customers.
Pipeline Segment 4
Contractor: Steve P. Rados Inc.
Segment 4 runs approximately one mile north from Gerber and Vineyard Roads to the Sacramento County Water Agency’s Vineyard Surface Water Treatment Plant at Florin and Knox Roads. This 66-inch diameter pipeline can convey up to 85 MGD. Treated water is then distributed to SCWA customers in central Sacramento County.
Additional Pipeline Reaches
Northern Reach Pipeline
Contractor: S.J. Louis Companies
Installation of 32,500 feet of 72-inch diameter mortar-lined and dielectric-coated steel pipe (ML&DCS).
Middle Reach Pipeline
Contractor: S.J. Louis Companies
Installation of 36,450 feet of 72-inch diameter 72-inch ML&DCS steel pipe.
Southern Reach Pipeline
Contractor: Sundt Construction
Construction of 24,410 feet of 72-inch ML&DCS steel pipe and 430 feet of RCC pipe, including:
- A 430-foot microtunnel under the Mokelumne River
- A 240-foot tunnel under Highway 12
Pumping Plants
Clay Station Pumping Plant
Contractor: Balfour Beatty
Capacity: 100 MGD
Key features include:
- 46 ft × 194 ft reinforced concrete building with internal piping
- Four 1,750 hp vertical turbine pumps (two with variable frequency drives)
- Reinforced concrete intake structure at the Folsom South Canal
- Site piping with an 84-inch ML&CS suction header and 72-inch ML&CS discharge header
- 200,000-gallon, 144-ft diameter underground steel surge tank
- 69 kV transmission substation with breakers, switches, and transformer
- Driveway, parking, and site landscaping
Camanche Pumping Plant
Contractor: Balfour Beatty
Capacity: 100 MGD
Key features include:
- 46 ft × 217 ft reinforced concrete pumping building
- Four 2,000 hp vertical turbine pumps with VFDs
- Site piping with an 84-inch suction header and 72-inch discharge header
- 50,000-gallon underground steel surge tank
- 4-million-gallon prestressed concrete reservoir with aluminum dome roof
- 230 kV transmission substation with control building and ring bus
- 12.47 kV switchgear lineup and 12.47/7.2 kV overhead line to Mokelumne Fish Hatchery
- Driveway, parking, landscaping, and debris removal
Flow Management Facilities
Brandt Flow Splitting Facility
Contractor: Balfour Beatty
Construction of a reinforced concrete vault that includes:
- Two 54-inch flow lines and one 42-inch line with valves and flowmeters
- Integration with three existing Mokelumne Aqueducts
- Intake Facility
- River Wall
- Pipelines
- Water Treatment
Additional Links